2022

Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3
Panel

Database to Intacct Integration

  • Setup your Database for Integration. For this Tutorial I am using MySQL Database Named "IntacctDB".
  • Create tables "dbaccount" in Database with following script.

Database Script : MYSQL

Database Script : SQLSERVER

Database Script : Oracle

Code Block
create table `IntacctDB`.`dbAccount`

(`AccountID` varchar(100) NOT NULL ,
`AccountName` text NOT NULL ,
`BillingStreet` text ,
`BillingPostalCode` numeric(20) ,
`AnnualRevenue` decimal(30,2) ,
`CreatedDate` date ,
`LastModifiedDate` datetime ,
`NumberOfOfficeLocations` int ,
PRIMARY KEY (`AccountID`) );
Code Block
create table dbAccount

(AccountID varchar(100) NOT NULL ,
AccountName text NOT NULL ,
BillingStreet text ,
BillingPostalCode numeric(20) ,
AnnualRevenue decimal(30,2) ,
CreatedDate date ,
LastModifiedDate datetime ,
NumberOfOfficeLocations int ,
PRIMARY KEY (AccountID) );
Code Block
 CREATE TABLE "SYS"."DBACCOUNT"

("ACCOUNTID" VARCHAR2(20 BYTE) NOT NULL ENABLE,
"ACCOUNTNAME" VARCHAR2(100 BYTE),
"BILLINGSTREET" VARCHAR2(50 BYTE),
"BILLINGPOSTALCODE" VARCHAR2(50 BYTE),
"ANNUALREVENUE" NUMBER(30,2),
"CREATEDDATE" DATE,
"LASTMODIFIEDDATE" VARCHAR2(40 BYTE),
"NUMBEROFOFFICELOCATIONS" NUMBER(*,0),
 CONSTRAINT "DBACCOUNT_PK" PRIMARY KEY ("ACCOUNTID")
 );
  • Enter a sample data in "dbAccount" table.
  • Go to www.mydbsync.com. Open www.mydbsync.com in your browser and click on Customer Login.
  • Enter your DBSync username and password to login. Click on Launch to navigate to Project console.
  • Click on Project on the left section of console. Click on Create New Project, enter project name as Database-Intacct & click on Save.
  • A new Project will be created by given Name. In this tutorial I have used name Database-Intacct.
  • Click on Create New Process, enter process name as DatabasetoIntacct, click on Save to save the process.
  • Click on Connectors on the left section of Project console. You need to create new connectors for Database & Intacct.
  • Click on Create New Connector enter the connector name as Intacct & select the connector type as Intacct Adapter and click on Save.
  • Enter all the required details, click on Save & then Validate connection.
  • Intacct Connector is created and the connection is validated. Next, Database adapter need to be created.
  • Click on Connectors on the left section of Project console. Click on Create New Connector.
  • Enter connection name as Database & select the connector type as Database Adapter and click on Save.
  • Enter all the required details, click on Save & then Validate connection.
  • Click on Projects, click on the project Database-Intacct, there you will see the new process DatabaseToIntacct. Click on the newly created process DatabaseToIntacct.
  • Using the button Create New Workflow, create the workflow "Execute".
  • Click on workflow Execute, You will see two sections Trigger on the top & Rules in the bottom.
  • In Trigger section, go to Advanced Query Builder select Datasource as Database.
  • Click on Switch to Advanced view & enter the below query in the Query Builder. Click on Save and Close.
Code Block
 select AccountID, AccountName, BillingStreet, BillingPostalCode, AnnualRevenue, LastModifiedDate, NumberOfLocations from dbaccount
  • In Rules section of a workflow, click on Add New Rule, Select Target Connector, Operation, Target Object as Intacct, Insert, create_customer respectively.
  • Click on the Map in this newly created Rule, you will see a mapping screen.
  • In the mapping screen, you will see list of target fields in the left section. On the right you will the source fields under Schema.
  • Drag & drop the required fields from Schema into the required source fields.
  • Once you are done close the mapping screen from Save and Close button on the top right. Save the workflow and ensure that the status of workflow is On.
  • You can run the integration, using the Run button or the Scheduler in the left section of Project console. Run button is available once you open the project.
  • Using the button Logs in the left section, you can view the Logs.
  • This concludes brief introduction on building DBSync integration data flow from Database to Intacct.